Project details
Location
Cherry Hill, NJ
Project
Primary bathroom gut renovation
Key work
Corroded drain pipe replaced, walk-in shower with lit niche and bench, dual vanity, wall-hung toilet
Timeline
About 4 weeks
Cherry Hill, NJ
A primary bathroom rebuilt from the plumbing out, with a corroded drain pipe replaced first and a walk-in shower built around a full-width lit niche.
Once the floor was opened, the old plumbing was the first problem to solve. Mariusz and a licensed plumber replaced a corroded copper drain pipe with new PVC drains before any finish work began.
The walk-in shower is the centerpiece, with a ceiling rain head, a wall shower head and a handheld. A lit niche runs the full width of the wall, and a built-in bench and glass door on a black sliding track finish it. The tile was set with a laser line and leveling clips.
Across the room, a long dual vanity in light wood sits under backlit mirrors, with a black towel warmer on the wall and a wall-hung toilet for a clean, minimal look.
Location
Cherry Hill, NJ
Project
Primary bathroom gut renovation
Key work
Corroded drain pipe replaced, walk-in shower with lit niche and bench, dual vanity, wall-hung toilet
Timeline
About 4 weeks
Talk to Mariusz, the owner, who leads every job. Free estimates in Cherry Hill and across South Jersey.