Primary Bathroom Gut Remodel with Walk-In Shower

Cherry Hill, NJ

Rebuilt from the Plumbing Out

A primary bathroom rebuilt from the plumbing out, with a corroded drain pipe replaced first and a walk-in shower built around a full-width lit niche.

Primary bathroom remodel with walk-in shower in Cherry Hill, NJ Primary bathroom remodel with walk-in shower in Cherry Hill, NJ

The Transformation

Once the floor was opened, the old plumbing was the first problem to solve. Mariusz and a licensed plumber replaced a corroded copper drain pipe with new PVC drains before any finish work began.

The walk-in shower is the centerpiece, with a ceiling rain head, a wall shower head and a handheld. A lit niche runs the full width of the wall, and a built-in bench and glass door on a black sliding track finish it. The tile was set with a laser line and leveling clips.

Across the room, a long dual vanity in light wood sits under backlit mirrors, with a black towel warmer on the wall and a wall-hung toilet for a clean, minimal look.

Project details

Location
Cherry Hill, NJ

Project
Primary bathroom gut renovation

Key work
Corroded drain pipe replaced, walk-in shower with lit niche and bench, dual vanity, wall-hung toilet

Timeline
About 4 weeks

See more remodeling projects

Get FREE Project Estimate

The Finished Bathroom

Before and During Construction

Walkthrough

AFTER

Planning a project like this?

Talk to Mariusz, the owner, who leads every job. Free estimates in Cherry Hill and across South Jersey.