Leaking Small Bathroom Rebuilt as a Spa Retreat

Cherry Hill, NJ

From a Leak to a Spa Retreat

A shower leak had damaged the ceiling, and the waterproofing behind it was almost non-existent. We took this Cherry Hill bathroom down to the studs, rebuilt it properly and made the room bigger.

“Mario turned my leaking small bathroom into a modern spa like experience! We didn't know what we wanted to do to fix it and he came up with solutions and even expanded a small bathroom into a bigger, more inventing space. He was clean, and communicated every step of the process! He has an eye for modern design!”

Allen F.Client
Bathroom before the rebuild, with a vanity on the left and the old tiled shower ahead, a ladder standing inside it Leak-damaged bathroom rebuilt in Cherry Hill, NJ

The Transformation

This small bathroom had a shower leak that had damaged the ceiling. Once we looked into it, we found the waterproofing from a previous company was almost non-existent. So we took the room back to the studs and started over.

With the walls and floor open, the damage was easy to see. The leak had reached the old copper lines, so Mariusz and a licensed plumber replaced the supply and drain lines with new PEX and PVC. We also repaired the floor framing, then moved walls and took 18 inches from the bedroom to make the room bigger.

Before any finish tile went in, the shower got a full Schluter waterproofing system and the floor got Ditra heated-floor prep. A linear drain runs along the shower wall, and the large-format tile was set with a laser line and leveling clips.

The centerpiece is a frameless glass steam shower with full-height charcoal tile, warmed by a wood-grain porcelain accent wall. Gold fixtures carry through to the floating fluted-wood vanity. Backlit built-in shelves replace the old medicine cabinet, a pocket door saves floor space, and a smart toilet finishes the room.

Project details

Location
Cherry Hill, NJ

Project
Leak repair and bathroom rebuild

Key work
Failed waterproofing replaced, floor framing repaired, new supply and drain lines, walls moved to gain 18 inches, steam shower, custom backlit shelving

Timeline
About 5–6 weeks

See more remodeling projects

Get FREE Project Estimate

The Finished Bathroom

Before and During Construction

Walkthrough

After
During Construction

Planning a project like this?

Talk to Mariusz, the owner, who leads every job. Free estimates in Cherry Hill and across South Jersey.