Front Entry Steps Rebuild

Cherry Hill, NJ

New Steps Over the Old Brick

Mariusz designed and built new front entry steps for this Cherry Hill home, framed right over the old brick steps.

The Build

Instead of tearing out the old brick steps, Mariusz built a new pressure-treated frame over them.

The new frame carries the steps from the front door down to the walkway.

He finished it with new treads, black grip strips on every step and trim along both sides.

Project details

Location
Cherry Hill, NJ

Project
Front entry steps rebuild

Key work
Design, pressure-treated framing, treads, grip strips, trim

Designed and built by
Mariusz Perkowski

See more remodeling projects

Get FREE Project Estimate

The Finished Steps

During the Build

Planning a project like this?

Talk to Mariusz, the owner, who leads every job. Free estimates in Cherry Hill and across South Jersey.